Last 25 builds Last 7 days Last 30 days Last 90 days All builds

Recent plan failures

Failed In Fixed In Time Taken To Fix
#2 Manual run from the stage: Release by Nathan Ruhanga

#3 Manual run by Nathan Ruhanga

1 build

15 minutes

  • Average time to fix a failure: 15 minutes
  • Average number of builds between fixes: 1 builds
  • The longest time taken to fix a failure is 15 minutes, from failure starting in build #2.
  • The greatest number of builds taken to fix a failure is 1, from failure starting in build #2.