None
Recent plan failures
Failed In | Fixed In | Time Taken To Fix | ||
---|---|---|---|---|
#6 |
Manual run from the stage: Release by Nethmi Rodrigo
|
#7 |
Manual run from the stage: Release by Nethmi Rodrigo
|
1 build 1 week, 21 hours, 20 minutes |
- Average time to fix a failure: 1 week, 21 hours, 20 minutes
- Average number of builds between fixes: 1 builds
- The longest time taken to fix a failure is 1 week, 21 hours, 20 minutes, from failure starting in build #6.
- The greatest number of builds taken to fix a failure is 1, from failure starting in build #6.