Recent plan failures
Failed In | Fixed In | Time Taken To Fix | ||
---|---|---|---|---|
#4126 |
Scheduled
|
#4133 |
Scheduled
|
7 builds 1 week, 23 minutes |
#4123 |
Scheduled
|
#4125 |
Scheduled
|
2 builds 2 days, 1 minute |
- Average time to fix a failure: 4 days, 12 hours, 12 minutes
- Average number of builds between fixes: 4.5 builds
- The longest time taken to fix a failure is 1 week, 23 minutes, from failure starting in build #4126.
- The greatest number of builds taken to fix a failure is 7, from failure starting in build #4126.