Release plan for OpenMRS Platform 2.7.x
Build: #2 failed Manual run from the stage: Release by Wikum Chamith Weerakutti
Build result summary
Details
- Completed
- Queue duration
- < 1 second
- Duration
- 45 minutes
- Labels
- None
- Revisions
-
- OpenMRS Platform
-
ff06b97b522c2ec4020e704c4d23c7f9b0ef39cc
- Release scripts
-
ced9ff00825ca1cb8c744547be4ba8ff994bd71b
- openmrs-module-webservices.rest
-
5dc594d7b5bcdf5af6eac19005964229bc540f3f
- Standalone Platform Pre 2.4
-
c900cf54e912db0b64dbdabeb5159d55a4423075
- Standalone
-
60ac6d91c7e4ca7411f68ae9bf84d0550289952f
- Fixed in
- #4 (Rebuilt by Wikum Chamith Weerakutti)
Responsible
No one has taken responsibility for this failure
Error summary for Release to maven
The job generated some errors, drill down into the full build log for more details.
[ERROR] mvn release:prepare failed. Attempting to do a release rollback.
[ERROR] mvn release:prepare failed, scroll up the logs to see the error. release:rollback was attempted. Delete the tag from the repository (if it exists), check if the SCM tag is a ssh and not http and try again.
[ERROR] mvn release:prepare failed, scroll up the logs to see the error. release:rollback was attempted. Delete the tag from the repository (if it exists), check if the SCM tag is a ssh and not http and try again.