Build: #9 failed Manual run from the stage: Release by SSEBAANA Suubi Joshua

Stages & jobs

  1. Build and push

  2. Validate

  3. Update versions

  4. Release

    Requires a user to start manually
  5. Release 2nd stage

  6. Release 3rd stage

Build result summary

Details

Completed
Queue duration
< 1 second
Duration
123 minutes
Labels
None
Revisions
OpenMRS Platform
b40c3bca8258b9ae83011d3966374b5660dfe1a3
Release scripts
d5831e94deff58c79f07afa118e3aad928391687
openmrs-module-webservices.rest
8d2969f99eeaed250cc2f9510192498305610864
Standalone
f46f2024816d4c6faf8f84ca91c0c26573145546
Failing since
#5 (Rebuilt by SSEBAANA Suubi Joshua)
Fixed in
#11 (Manual run by Nathan Ruhanga)
No failed test found. A possible compilation error occurred.

Responsible

  • Daniel Kayiwa Daniel Kayiwa Automatically assigned

Code commits

OpenMRS Platform
Author Commit Message Commit date
Darius Jazayeri Darius Jazayeri b40c3bca8258b9ae83011d3966374b5660dfe1a3 Bamboo was unable to extract changes between revision 24cd153af2c4da3102d144387e56de53bbe1c23e and b40c3bca8258b9ae83011d3966374b5660dfe1a3.

Configuration changes

Plan configuration has changed since the last successful build. See the plan audit log for more details.