None
Recent plan failures
Failed In | Fixed In | Time Taken To Fix | ||
---|---|---|---|---|
#14 |
Changes by Daniel Kayiwa
|
#18 |
Changes by Mutagubya Jonathan <mutajonathan4@gmail.com>
|
4 builds 6 days, 23 hours, 45 minutes |
#6 |
Manual run from the stage: Release by Nathan Ruhanga
|
#9 |
Manual run from the stage: Release by Nathan Ruhanga
|
3 builds 1 hour, 20 minutes |
#2 |
Manual run by Nathan Ruhanga
|
#5 |
Manual run by Nathan Ruhanga
|
3 builds 1 hour, 29 minutes |
- Average time to fix a failure: 2 days, 8 hours, 51 minutes
- Average number of builds between fixes: 3.33 builds
- The longest time taken to fix a failure is 6 days, 23 hours, 45 minutes, from failure starting in build #14.
- The greatest number of builds taken to fix a failure is 4, from failure starting in build #14.