Release Plan for stock management

Stages & jobs

  1. Test module

  2. Release

    Requires a user to start manually

Build result summary

Details

Completed
Queue duration
< 1 second
Duration
1 minute
Labels
None
Revisions
Git
1efa8c7f16c3c1871879aeaca912acd164e56964
Release scripts
ced9ff00825ca1cb8c744547be4ba8ff994bd71b
Total tests
46
Successful since
#10 ()

Tests

  • 0 New failures
  • 0 Existing failures
  • 0 Fixed

Code commits

Git
Author Commit Message Commit date
Eudson Bambo <78729572+ebambo@users.noreply.github.com> Eudson Bambo <78729572+ebambo@users.noreply.github.com> 1efa8c7f16c3c1871879aeaca912acd164e56964 Merge pull request #26 from alaboso/O3-3592
O3-3592 Packaging unit name for a drug item is translated from Englis…
Amos Laboso <alaboso@uonbi.ac.ke> Amos Laboso <alaboso@uonbi.ac.ke> f26c1870ac9e1d19465108d8eef238449e07efc6 O3-3592 Packaging unit name for a drug item is translated from English to French upon saving

Configuration changes

Some of the jobs or stages referenced by this result no longer exist.

Manual stage Release cannot be run as it references jobs that no longer exist.

Jira issues

IssueDescriptionStatus
Unknown Issue TypeO3-3592Could not obtain issue details from Jira