OpenMRS Core Master

Build: #1909 was successful

Job: Build and Test was successful

Stages & jobs

  1. Build and Test

  2. Deploy

  3. Release

    Requires a user to start manually

Job result summary

Completed
Duration
15 minutes
Revision
f773bb911f806f9667ba3b7071796a096a09ee8f
Total tests
4026
Successful since
#1876 ()

Configuration changes

Job Build and Test with key TRUNK-MASTER-JOB1 no longer exists.

Tests

  • 4,026 tests in total
  • 38 tests were quarantined / skipped
  • 10 minutes taken in total.